References
175 MW Solarpark "Don Rodrigo", Southern Spain
500.000 Solar modules installed on an area of 265 hectare
GFH 30 Fibre-optic building entry
Constructing a gigabit broadband network as standard
Sealing of main supply lines at Augsburg University Hospital
The six-storey building contains a total floor area of approx. 30,000 square metres, with an effective …
IBERDROLA 275KV „WINDY HILL“ SUBSTATION
Stop water leaking into the main substation
NEW COMPRESSOR STATION CONSTRUCTION IN WERTINGEN
Professional connection of corrugated ducts
According to the …
Residential Tower, Dubai
Sealing of wall openings
QLD State Netball Stadium - Brisbane
Maintaining the integrity of waterproofing under a base slab
Electrical and data services enter the building via conduits passing through a core filled block wall with a membrane waterproofing into the Main Switchboard Room.
The challenge was maintaining the integrity of the …
MALMÖ AIRPORT, SWEDEN
Replacing the power grid
Malmö Airport decided to replace the power grid. The new grid was installed first. After completion they switched from the old to the new network. The contractor ApQ had the choice between different manufacturers and the solutions they offered. They decided …
Trans Adriatic Pipeline, Greece
Flexible and watertight duct connection
The Trans Adriatic Pipeline (TAP) will start near Kipoi on the border of Turkey and Greece, where it will connect with the Trans Anatolian Pipeline (TANAP). From there, TAP will continue onshore, crossing the entire territory of Northern …